Take in

Vertical caving terminology and methods > Calls > Ladder and climbing calls

Take in

Shouted by the climber after connecting to the rope. Tells the belayer to take in any remaining slack. May also be used during the climb if the belayer has allowed too much slack to build up.


|

This page is not intended to be viewed this way, please load the . This version exists only to make it easier for search engines to understand the contents.